Planning a new home? This 2026 Lahore construction cost guide uses July mid-market rates — realistic for A-grade builds, between cheap online ads and luxury import specs.
Lahore Construction Rates 2026 (Planning)
| Stage | Standard A-grade (PKR / sq ft) | Notes |
|---|---|---|
| Grey structure | 2,950 – 3,250 | Mid anchor ≈ 3,100 |
| Standard turnkey | 7,000 – 8,000 | Mid anchor ≈ 7,400 |
| Premium turnkey | 8,500 – 10,000 | Better elevations and fittings |
| Luxury | 10,500 – 12,500+ | Imported specs |
Rates assume materials plus labour. Soil, basement, and society approvals can add 8–15%.
Cost Share by Stage
Understanding where money goes helps you compare quotes fairly.
| Stage | Typical Share | Includes |
|---|---|---|
| Grey Structure | 40–45% | Foundation, RCC, brickwork, plaster |
| MEP | 10–15% | Electrical, plumbing, HVAC rough-in |
| Finishing | 35–45% | Marble, paint, kitchens, bathrooms |
| External | 5–10% | Gates, landscaping, boundary wall |
Plot Size Examples (Standard Mid Rates)
| Plot | Covered (approx.) | Grey (~3,100) | Turnkey (~7,400) |
|---|---|---|---|
| 5 Marla | 2,300 sq ft | ~ PKR 71 lac | ~ PKR 1.70 crore |
| 10 Marla | 3,500 sq ft | ~ PKR 1.09 crore | ~ PKR 2.60 crore |
| 1 Kanal | 5,400 sq ft | ~ PKR 1.67 crore | ~ PKR 4.00 crore |
These are planning anchors — your architect's covered area and finish schedule move the final number.
Factors That Change Your Budget
Plot and structure
- Plot size — 5 marla, 10 marla, 1 kanal
- Soil and foundation — pile vs standard footings
- Storeys and basement — coverage and steel quantities
Location and spec
- Society — DHA often +10–15% vs outer Lahore
- Material grade — steel, cement, marble, sanitary brands
- Design complexity — double-height lobbies, large spans, CNC elevation
DHA and Bahria Town
Budget authority and utility fees separately from contractor BOQ. Compare dedicated guides for grey structure costs and turnkey costs before signing.
How to Save Without Cutting Quality
- Finalize drawings before foundation excavation
- Lock material brands early when supply is stable
- Use milestone payments tied to measurable progress
- Prefer one accountable contractor for grey through finishing
- Avoid mid-project elevation changes
Request Your 2026 Construction Estimate
Bin Sadiq Construction provides free site surveys and itemized BOQs across Lahore societies.
Get a Quote — share plot location and target finish for a transparent estimate.