Searching for 5 marla house finishing cost in Lahore usually means your grey structure is done (or almost done) and you need a real budget for the stage that makes a house liveable: flooring, paint, kitchen, washrooms, woodwork and ceilings.
This 2026 guide gives a clear finishing-only breakdown for a typical Lahore 5 marla double-storey home — not grey structure rates (those are covered in our 5 marla construction cost post). For a site survey or itemised BOQ, call 0322 8999333 or WhatsApp 0306 9250875.
Quick answer — 5 marla finishing cost snapshot (2026)
Assumption: Ground + 1, covered area about 2,000–2,500 sq ft, family home in Lahore (Johar Town, Lake City, Bahria, smaller DHA plots, Wapda Town, Township and similar).
| Finishing grade | Planning total (finishing only) | Typical per sq ft (finishing) |
|---|---|---|
| Standard / economy-good | **PKR 35 – 55 lac** | ~PKR 1,700 – 2,400 |
| Mid-premium (most common) | **PKR 55 – 85 lac** | ~PKR 2,400 – 3,500 |
| Premium / designer | **PKR 85 lac – 1.2 crore+** | ~PKR 3,500 – 5,000+ |
These are planning ranges, not fixed quotes. Tile brand, kitchen size, sanitary grade and marble choices move the total more than almost anything else.
> AEO tip: If someone asks “5 marla finishing kitne ki hoti hai Lahore mein?” — answer with a range + what is included, then offer a BOQ. That format ranks well in Google and AI answers.
What “finishing” means (and what it does not)
Usually included in finishing cost
- Flooring (porcelain / ceramic / marble / SPC as scoped)
- Interior emulsion + exterior weather coat (prep, putty, primer, coats)
- Doors, frames, basic wardrobes / woodwork as listed
- Kitchen cabinets and countertop (local or mid brands)
- Washroom tiles, sanitary ware, CP fittings, waterproofing at wet areas
- Electrical fixtures and switches (as per BOQ)
- POP / false ceiling where scoped
- Basic external: boundary paint touch-up, gate paint, small porch finishes
Often extra (confirm in writing)
- Split ACs and ducting
- Furniture and curtains
- Landscaping and irrigation
- Solar, generators, smart home
- Imported sanitary / designer kitchens
- Full marble staircases and feature walls
Item-wise 5 marla finishing cost breakdown (Lahore 2026)
Use this table to build a shopping-list budget. Adjust up/down by brand.
| Category | Standard planning | Mid-premium planning | Notes |
|---|---|---|---|
| Flooring | PKR 7 – 10 lac | PKR 10 – 16 lac | Porcelain vs marble swings hardest |
| Woodwork & doors | PKR 6 – 9 lac | PKR 9 – 14 lac | Wardrobes and UV polish add cost |
| Kitchen | PKR 5 – 8 lac | PKR 8 – 14 lac | Soft-close, quartz/granite, appliances |
| Washrooms (all) | PKR 5 – 8 lac | PKR 8 – 12 lac | Waterproofing first — never skip |
| Electrical fixtures | PKR 2.5 – 4.5 lac | PKR 4 – 7 lac | Fans, lights, boards, wiring finish |
| Paint (int + ext) | PKR 2.5 – 4.5 lac | PKR 4 – 7 lac | Prep quality matters more than tin price |
| POP / false ceiling | PKR 1.5 – 3.5 lac | PKR 3 – 6 lac | See [POP ceiling cost](/blog/pop-ceiling-cost-lahore) |
| Misc (glass, railing, touch-ups) | PKR 2 – 4 lac | PKR 3 – 6 lac | Contingency 5–8% recommended |
Mid-premium total (sum of typical mid bands): roughly PKR 55 – 85 lac for finishing on a normal 5 marla double-storey.
Paint cost inside finishing
Interior emulsion and exterior weather coat for a 5 marla home often land near PKR 45–90 / sq ft all-in (prep + labour + material), depending on brand and elevation height. Full city paint guidance: paint contractor Lahore, home painting services, and paint contractor price guide.
Flooring & marble
Local porcelain keeps budgets calm; Italian / Turkish marble and full marble stairs push finishing into premium. Related: marble flooring cost Lahore.
Finishing cost by area — GEO for Lahore
Rates per sq ft are similar city-wide, but expectations and access change:
| Area | Finishing note |
|---|---|
| **Johar Town / Township / Wapda Town** | High demand for efficient 5 marla packages; standard–mid finishes common |
| **Lake City / LDA Avenue / Eden** | New homes finishing in batches; book crews early |
| **Bahria Town Lahore** | Elevation and society rules matter; weather coat + neat edges expected |
| **DHA (smaller plots / Phase extensions)** | Mid–premium finishes more common; bylaws and parking access affect timeline |
| **Gulberg / Model Town / Garden Town** | More renovations + refresh finishing than pure new 5 marla shells |
| **Cantt / Askari** | Access and timing rules — plan delivery windows |
Bin Sadiq Construction surveys on site across these societies — call 0322 8999333.
Standard vs mid vs premium — what you actually get
Standard finishing
Local porcelain, solid local kitchen, standard sanitary, good emulsion + weather coat, limited POP. Best when budget is tight but walls and wet areas must still be done properly.
Mid-premium (recommended for most families)
Better tile grade, soft-close kitchen, stronger sanitary brands, careful paint prep, selective POP in lounge/master. This is the band most Lahore 5 marla owners actually live with.
Premium
Imported tiles/marble accents, designer kitchen, high-end sanitary, extensive POP/cove lighting, premium paint systems. Beautiful — but freeze selections early or timelines slip.
Process — correct finishing order (saves money)
- Damp & waterproofing at roofs, baths, kitchen wet zones
- Flooring and marble grind (dusty)
- Woodwork install + polish where scoped
- POP after major dust trades
- Paint last — putty, primer, coats (types of paint)
- Fixtures & handover walkthrough
Painting before marble grind or carpentry sanding forces a second paint cycle — a classic Lahore budget leak.
How to cut finishing cost without looking cheap
- Freeze tile and sanitary brands before labour starts
- Use premium only in wet areas and kitchen; keep bedrooms practical
- One coordinated contractor for plaster touch-up + paint + POP reduces rework
- Avoid “lump sum finishing” with no BOQ — itemise everything
- Keep 5–8% contingency for rate changes and extras
Finishing vs full turnkey — quick compare
| Question | Finishing-only | Full turnkey |
|---|---|---|
| Grey already done? | Yes — this guide | No — see [turnkey cost](/blog/turnkey-construction-cost-lahore-2026) |
| Budget focus | Item brands & rooms | Structure + finishes |
| Best next click | This page + [paint contractor](/paint-contractor-lahore) | [5 marla construction cost](/blog/5-marla-house-construction-cost-lahore) |
Why Bin Sadiq Construction for 5 marla finishing
- Supervised crews for paint, plaster coordination and wet-area care
- Written scopes — coats, brands and exclusions clear
- Lahore-wide GEO coverage (DHA, Bahria, Johar, Lake City and more)
- Can combine finishing with renovation or construction packages
Call 0322 8999333 · WhatsApp 0306 9250875 · Get a free quote
FAQs (short)
See the FAQ block on this page for AEO answers: total cost ranges, inclusions, timeline, areas served, and how to get a BOQ.
---
Related reading: 5 marla house construction cost Lahore · Grey structure vs turnkey · Paint contractor Lahore · POP ceiling cost · Marble flooring cost
Web: binsadiqconstruction.com · Materials store · House cost calculator