Looking for an HVAC / AC ducting contractor in Lahore? Proper cooling and ventilation need load planning, duct routes, ceiling coordination, vents, insulation and safe power planning — not only buying AC units and deciding the rest later.
Bin Sadiq Construction delivers HVAC and AC ducting works in Lahore for homes, offices and selected commercial spaces with a written scope after survey.
> Related: MEP contractor · Electrical contractor · False ceiling contractor · Interior finishing · Construction company Lahore
Quick answer
| Question | Short answer |
|---|---|
| Service | HVAC / AC ducting contractor |
| Typical work | Ducting, vents, exhaust, fresh-air, coordination |
| Full MEP? | MEP contractor |
| Ceiling coordination? | False ceiling contractor |
| Contact | 0322 8999333 · WhatsApp 0306 9250875 |
What HVAC / ducting work usually includes
| Item | Typical work |
|---|---|
| Load planning | Room use, size, heat and airflow needs |
| Duct routes | Main trunk, branches, ceiling path |
| Diffusers / grilles | Supply and return positions |
| Ventilation | Fresh-air and exhaust where scoped |
| Insulation | Duct wrap and condensation control |
| Testing | Airflow, access and coordination checks |
Urdu: HVAC کو false ceiling سے پہلے فائنل کریں — بعد میں duct اور lights clash کرتے ہیں۔
Our process
- Survey — room sizes, ceiling depth, shaft and outdoor unit position
- Written scope — ducting, grilles, exhaust, fresh-air and power coordination
- Route planning with structure and ceiling layout
- Duct fabrication / installation and insulation
- Electrical and equipment coordination
- Testing before ceiling closure and final handover
No fixed PKR tables. Depends on area, duct lengths, ceiling depth, unit type and ventilation scope — written plan after survey.
Client checklist
- Decide split AC vs ducted / central approach early
- Lock false ceiling height before duct fabrication
- Confirm kitchen exhaust and fresh-air needs separately
- Coordinate with electrical contractor for load and DB
- Review return-air path, not only supply vents
- Avoid late HVAC changes after gypsum work starts
Red flags: no load planning, too-small return air, ducts crushed inside shallow ceilings, no access panels for servicing.
Areas & contact
All Lahore after survey; surrounding and selected Pakistan projects.
Contact: Call 0322 8999333 or WhatsApp 0306 9250875 · Get a quote · MEP contractor · False ceiling contractor
Bin Sadiq Construction — binsadiqconstruction.com



